top of page

Infrastructure

Bank Station Capacity Upgrade – Track Installation Works

Client: Dragados S.A/TfL
Project Delivery Date: Completed May 2022
Project Value: £650k (Package value £3.2mil)


Project Scope: 
The installation of 700m of cast in-situ concrete slab track and third and fourth rail conductor rail system.

Project Overview:
CTS was engaged by Dragados to form an internal delivery team for the management of their track installation package as part of the Bank Station Upgrade (BSCU) Project.

 

Managing design from compliance to IFC, CTS then managed the installation of 715m of new slab track and associated conductor rail system; providing project and construction management, supervision and engineering support on the project and full assurance and handover to revenue service to complete a successful 17-week blockade of the Northern Line. 

 

Completed May 2022, safely, on time and on budget. 

Piccadilly Line Upgrade – Northfields Sidings Sheet Pile Walls

Client: Balfour Beatty/TfL
Project Delivery Date: March 2023 – Ongoing
Project Value: £300K


Project Scope: 

  • Install sheet piles to form ballast and structural retention for new sidings 

Project Overview:

  • Delivery, setting out and installation of sheet piles

  • Managing logistics of site deliveries to a rail-locked site

  • Integrated with various other civil engineering activities over the weekend closure

  • Works ongoing over a series of weekend closures

London Underground – Boundary Fencing Works

Client: Cleshar/TfL
Project Delivery Date: Nov 2022 – Ongoing
Project Value: £800,000+


Project Scope: 

  • Installation of various types of boundary fencing on London Underground infrastructure. 

  • Current installations have included;

  • Acoustic barriers

  • X-mesh

  • 358 Prison Mesh

  • Barbed and Raptor installations 

  • Multiple access points

  • Minor civils associated with the install   

bottom of page